Update Terakhir : 07 Nov 2016
Tabel |
Biaya Input Perusahaan Industri Besar dan Sedang Menurut
Kode Industri (000.000 Rp), 2013 |
Table |
Input Cost of Large and Medium
Manufacturing Establishments By Industrial Code (000,000 Rps), 2013 |
|
|
|
|
|
|
Kode Industri |
Bahan Baku |
Bahan Bakar, Listrik Dan Gas |
Lain-lain
Industri |
Sewa Gedung Mesin dan Alat-alat |
Jumlah |
Industrial Code |
Raw Materials |
Fuel, Electricity and Gas |
Industrials |
Rent of Building |
Total |
(1) |
(2) |
(3) |
(4) |
(5) |
(6) |
|
|
|
|
|
|
10 |
7 266 277 |
37 921 |
144 905 |
7 855 |
7 456 958 |
11 |
7 184 |
745 |
6 800 |
379 |
15 108 |
14 |
12 447 |
222 |
863 |
- |
13 532 |
15 |
4 923 |
- |
- |
- |
4 923 |
16 |
1 960 403 |
12 484 |
63 692 |
3 674 |
2 040 254 |
18 |
24 799 |
709 |
847 |
- |
26 356 |
19 |
12 494 |
5 367 |
28 434 |
1 2236 |
47 517 |
20 |
9 900 442 |
198 958 |
6 944 115 |
7 226 541 |
24 270 056 |
22 |
188 603 |
84 835 |
16 083 |
1 336 |
290 857 |
23 |
57 055 |
264 |
2 980 |
541 |
60 840 |
24 |
31 898 |
361 |
2 442 |
250 |
34 951 |
25 |
31 295 |
411 |
3 622 |
- |
35 328 |
30 |
409 103 |
9 164 |
85 183 |
16 353 |
519 803 |
31 |
26 404 |
215 |
2 139 |
- |
28 758 |
33 |
44 658 |
837 |
4 259 |
- |
52 786 |
|
|
|
|
|
|
Jumlah/Total
2013 |
19 977 985 |
352 492 |
7 309 396 |
7 258 151 |
34 898 027 |
2012 |
16 960 862 |
97 584 |
10 621 104 |
3 378 608 |
31 058 158 |
2011 |
17.866.909 |
179.438 |
- |
82.596 |
18.128.937 |
2010 |
12 226 908 |
77 282 |
152 303 |
404 719 |
12 861 212 |
2009 |
12 833 191 |
277 088 |
884 104 |
169 162 |
14 163 546 |
2008 |
16 413 317 |
311 946 |
448 323 |
266 447 |
17 440 033 |
Sumber:
Badan Pusat Statistik Provinsi Kalimantan Timur. |
|
|
Source: BPS-Statistics of Kalimantan Timur. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|